 | Metal part castingHigh quality parts in non-ferrous metals in 3 to 5 days using wax masters from the Renishaw vacuum casting process. MPC metal part casting system From master models to investment cast metal parts in 5 days using waxes from our vacuum casting process and metal part casting system. It is also possible to go direct to part using master models from many of the commercially available model making systems.
The system is particularly well suited for thin wall, complex geometries and delivers a high quality surface finish similar to a pressure die casting, from high quality master models.
There are several machines in the range with casting capacities from 3 to 15 litres. A system includes the casting unit, embedding unit, kilns for the burn-out process and all the necessary finishing and cleaning equipment.
Key features- start the process with any type of master model such as SLA, QuickCast, Objet, ThermoJet, Viper, LOM, SLS, FDM etc. and in any complexity
- combine additive technologies to save time and cost by going direct to metal casting via model burnout.
- low-cost tooling
- silicone tooling method produces fast, low-cost, multi-segment moulds for wax part production, impossible with standard, traditional tooling methods
|